With ION’s per-kilometer construction cost being $43 million, which seems quite reasonable, this is more or less in line with the per-mile construction cost of the Phoenix MetroRail light rail transit system which was U.S. $70 million. MetroRail opened in the late 1990s over 20 miles of right of way and having 28 stations. At that cost, included in it was equipment (trains), an equipment (train) storage yard, maintenance facility, overhead catenary, a double-track line, etc., all coming in at the grand total of U.S. $1.4 billion. Initial ridership projections at the time of opening was 26,000 per day. It was right on the money. The single-day ridership high was, for a long time, 43,000. This has probably been surpassed. I rode the line end-to-end twice. Both times the ride was most enjoyable!